Street Light Pole Installation Procedure

Firstly we contact with the departments of the pipeline to understand the approximate distribution of underground cables and knowing the detailed division of underground pipelines through excavation channels.
Street light pole installation procedure. The purpose of this technical instruction is to detail those actions necessary to ensure that street lighting columns are joined in compliance with the applicable design standards. Constructing a concrete base for a parking lot pole light. Led street light pole installation procedure there are 6 in stallation procedures of led street lamp pole for your reference. Below are some led street light installation guides and maintenance procedures for your guidance.
Mount the street light on the pole as shown below and correctly align with the road 3. With the screws supplied fix the light to the pole 5. Generally joined sections. Screw and secure the basis cage to the ground using the four screws.
Led street light installation guide and maintenance procedure. Drill three pilot holes equally spaced around the circumference of the pole and approximately 80mm from the light head 4. To install the foundation of your solar street light choose a level and flat ground with no inclination. Street lights on existing utility owned poles where there are permanent existing or necessary planned utility owned poles adjacent to the roadway the street lights may be installed upon the utility pole in lieu of the required street light poles.
Installation procedures for a solar street lamp 1. A concrete precast poured in place e16 19 reclaimed street light poles shall be disassembled by removing the davit arm and at all tenon joints. A professional evaluation should be carried out to ensure your poles adhere to local codes and are able to withstand the weather conditions of your location. The position of the street light poles shall conform to standard drawings 5 5a through 5 8.
D steel street light poles power installed screw bases e16 18 2 rocky road recycling 4154 mcgillvary blvd winnipeg manitoba contact. Installation procedure for light fixture installation works shall be carried out only with respect to approved shop drawings of latest revision. 1 0 check procedure for supplied joined sections 1 1 the pole sections may be supplied joined by ingal eps or may require on site joining. Installation of the foundation.
Ensure the mode switch is set to on and insert the rubber plug security screw. Lamp wattage pole spacing the distance between poles light intensity and area illumination must all be considered. Site engineer electrical has to ensure that all the lighting fixtures are received at site of latest revision.